Skip to content

Amendments to the Asbestos Control Program Penalty Schedule

Print Friendly, PDF & Email


Rule status: Adopted

Agency: DEP

Effective date: December 25, 2022

Proposed Rule Full Text
Asb-PS-Oct-22-for-City-Record.pdf

Adopted Rule Full Text
Asb-PS-22-FINAL-for-City-Record.pdf

Adopted rule summary:

Comments are now closed.

Online comments: 1

  • Robin Stokes

    Currently, Section 1-37(e) states “(e) Sampling pumps, cassettes, and tubing shall be checked before, during and after use. The sampling assembly shall be checked for leaks and occlusions.” The proposed change will and the words “and label” along with checked/inspected. What are the labeling requirements of air sampling equipment? It is not stated.

    Comment added October 11, 2022 12:27pm